INTRODUCTION TO CHURIN-PERU.

2011-2014 * HYDROELECTRIC POWER PROJECT. CHEVES. WORKING WITH HOCHTIEF. IN CHURIN-LIMA PERU

CHEVES PROYEJECT at Churin PERU. (Hydro-electric power project)

 

PERIOD: 27 Months (two years and three months)

 

POSSITION: Work Shop Manager (Superintendent)

 

IN CHARGE OF: Main workshop, satellite workshop, five running repair workshops at each tunnel front 24 hours duty, Main power  

                      house (6 generators), site power house (3 generators), 2 mixing plants (meka model), 2 mixing plant (uro model),

                      2 crussing plants and 1 washing and screening plant.

 

EQUIPMENT:     All of the above plus approx. 300 pieces of equipment, i.e. heavy and ligth equipment, tunnel equipment, trucks, cars

                      and pick-ups, etc.

 

PERSONNEL:     During main construction time approx. 125 workers and three expat. supervisors.

 

NOTE: DESIGNATE MEMBER OF THE COMMITTEE OF SAFETY ON SITE. 

HYDROELECTRIC POWER PROJECT CHEVES

HYDROELECTRIC POWER PROJECT CHEVES. THREE DAMS, 20KM. DE TUNNEL´S, AND ONE CAVE FOR POWER HOUSE

news: Andina, Lima. The construction of the hydroelectric plant of Cheves of SN Power, located in the provinces of Huara Oyon in the Lima region, will be operational in 2014, and will require an investment of US$400 million, reported today the Ministry of Energy and Mines Ministry (MEM). "The plant will generate 168 megawatts (MW) and its operation will require the waters of the rivers Huaura and Checras", said the minister of Energy and Mines, Pedro Sanchez.